Long drives need spares staged for the TBM machine to prevent costly delays, ensure safety, and keep tunnel projects on schedule with minimal downtime.
Segment supply delays can stop a TBM tunnel cold by halting progress, increasing costs, and causing equipment and crews to sit idle until materials arrive.
Long drives punish weak discharge on the TBM machine, causing delays, safety risks, and higher costs in tunnel construction. Improve discharge for better results.