Skip to content
CEGC CEGCCEGC
  • Product
  • Application
  • Service
  • Cases
  • About Us
0

Our Blog

Too much thrust can spike settlement in a TBM tunnel
on Apr 7, 2026

Too much thrust can spike settlement in a TBM tunnel

Too much thrust can spike settlement in a TBM tunnel by increasing ground stress, causing over-excavation and surface sinking. Control is essential.
Better torque control keeps a TBM tunnel predictable
on Apr 7, 2026

Better torque control keeps a TBM tunnel predictable

Better torque control keeps a TBM tunnel predictable by ensuring steady excavation, reducing downtime, and improving ground response for safer tunneling.
Balanced thrust keeps the TBM machine from yaw drift
on Apr 7, 2026

Balanced thrust keeps the TBM machine from yaw drift

Balanced thrust keeps the TBM machine from yaw drift by ensuring equal force on both sides, maintaining tunnel alignment and preventing costly misdirection.
micro tunneling thrust tuning protects pipe joints
on Apr 7, 2026

micro tunneling thrust tuning protects pipe joints

Micro tunneling thrust tuning protects pipe joints by controlling force, preventing cracks, leaks, and misalignment during trenchless pipe installation.
Thrust reserve helps a TBM machine break hard bands
on Apr 7, 2026

Thrust reserve helps a TBM machine break hard bands

Thrust reserve helps a TBM machine break hard bands by providing extra force to overcome tough rock, ensuring steady progress and reliable tunneling.
Uneven thrust can crack rings in a TBM tunnel
on Apr 7, 2026

Uneven thrust can crack rings in a TBM tunnel

Uneven thrust can crack rings in a TBM tunnel by causing stress and misalignment, leading to structural damage and tunnel ring failure.
  • Prev
  • 1
  • …
  • 246
  • 247
  • 248
  • 249
  • 250
  • …
  • 301
  • Next

lven@engrequip.com

+966-595334971

PRODUCTS

PRODUCTS

  • Port Machinary
  • Additional Equipment

APPLICATION

APPLICATION

  • Tunnelling
  • Mining
  • Ports

SERVICE

SERVICE

  • Customized Equipment Manufacturing
  • Service Consulting
  • Jobsite Assembly
  • Trenchless Support
  • Training
  • Spare and Wear Parts

CASES

CASES

  • Tunnelling Machinary
  • Mining
  • Port Machinary

ABOUT US

ABOUT US

  • About Us
  • News
  • Contact Us
Copyright © 2025 CEGC All Rights Reserved. sitemap, Top Blog Top Search
  • Choosing a selection results in a full page refresh.