Better anti-jam control keeps a TBM machine advancing by reducing downtime, preventing jams, and ensuring steady progress in challenging ground conditions.
Micro tunneling anti-jam plans reduce pipe joint damage by using packers, pressure control, and monitoring to prevent costly failures and ensure project safety.
A TBM tunnel jam often starts with rising torque trends. Monitor torque, thrust, and penetration rate to detect early warning signs and prevent downtime.
Micro tunneling clogs when slurry density drifts high due to thickened flow, filter cake buildup, and reduced material transport, risking delays and machine strain.