Goodeng Trenchless Horizontal Directional Drilling/Boring/Tunnelling Machine/Rig No-Dig Machine GS6000-TS

The GS6000-TS delivers unprecedented 600-ton class performance with revolutionary triple-engine technology that transforms the most impossible crossings into profitable realities. With colossal 6,700KN pullback force and earth-shattering 180,000Nm torque, this ultimate tunnelling giant conquers 2500-meter crossings and 2000mm reaming operations that leave every competitor helpless and projects managers scrambling for alternatives. The revolutionary triple 410kW engine system (1647HP total) provides unmatched flexibility - operate with all three engines for maximum power or selectively use dual/single engine configurations for optimal fuel economy, while built-in redundancy ensures continuous operation even with engine failures, protecting multi-million-dollar project timelines. Advanced automated drilling control system with constant torque capability delivers computer-controlled precision that protects drill rods while optimizing drilling parameters automatically, reducing operator error and maximizing drilling efficiency on complex geology. The patented four-point clamping technology dramatically improves structural rigidity and strength compared to conventional three-point systems, with enhanced clamping force and unloading torque that handles the most demanding drill string operations reliably. Goodeng's patented automated rod loading mechanism liberates labor and reduces crew costs significantly while improving safety on demanding job sites where every second counts. The integrated compact design (3.5m wide, 3.6m high) meets international transportation regulations while housing the most powerful drilling system available, reducing mobilization complexity and costs substantially. High-pressure 35MPa mud system with 4-inch flow channels maintains hole stability in the most challenging geology from soft alluvium to fractured bedrock. The 5-ton integrated crane handles massive drill strings and pipe sections efficiently, while the spacious climate-controlled operation room keeps crews comfortable during extended tunnelling campaigns. Choose the GS6000-TS when your reputation depends on conquering the impossible mega-tunnel projects that separate legendary contractors from ordinary equipment operators.

FAQ

To become a first-class international machinery manufacturing enterprise.
How long is the warranty?

12 months or 2000 working hours after shipment, whichever comes first.(varies depending on the type of machinery)

What is the delivery time?

A. Stock.
B. Semi-finished products, delivery within half a month to two months after receipt of deposit.
C. Special configuration, negotiable.

What payment terms are acceptable?

A. When you have the intention to purchase the machine, you can first pay 30% of the contract amount of deposit, when you need to ship, pay the remaining 70% of the contract amount in advance.
B. When you have the intention to purchase the machine, we can provide you with financing solutions in case of insufficient cash.

What logistics can we use for shipping?

Can pass the logistics truck: standard box: 6.8 meters /13.5 meters /17.5 meters, high hurdles: 9.6 meters, high hurdles/high and low board: 13 meters, climbing car: 13.5 meters /17.5 meters, flat car: 13.5 meters /17.5 meters

How about after-sales service?

We have offices and professional after-sales service teams in many countries. After receiving the new machine, we will provide you with 3-5 days of engineering training installation and commissioning services. If there is a problem, our after-sales service team will arrive at the project site in the shortest possible time.