TBM tunnel advance improves when soil won’t cling, leading to faster progress, less downtime, and reduced maintenance by preventing cutterhead clogging.
Micro tunneling coatings reduce blockage cleanout time by preventing debris buildup, making pipe maintenance faster and more efficient for trenchless projects.
TBM tunnel clay rings shrink due to water loss and adhesion. Anti-adhesion control prevents shrinkage, reducing settlement and improving tunnel safety.
Coatings reduce restart failures on TBM machine drives by protecting cutterheads from corrosion, abrasion, and heat, ensuring longer uptime and efficiency.
Choosing a selection results in a full page refresh.