Micro tunneling separation must match peak flow rates to prevent delays, control costs, and ensure efficient slurry processing in urban tunneling projects.
Better separation improves micro tunneling line control by keeping slurry clean, ensuring tunnel accuracy, protecting equipment, and boosting efficiency.
Separation capacity is micro tunneling’s hidden bottleneck, causing delays, higher costs, and reduced TBM efficiency when not properly sized or managed.