Micro tunneling pressure control cuts shutdown frequency by stabilizing tunnel face, preventing ground loss, and ensuring efficient, uninterrupted operations.
TBM machine pressure stability is real schedule insurance, minimizing delays, reducing risks, and ensuring tunneling projects finish on time and within budget.
Bad grout timing can ruin a TBM tunnel ring by causing segment misalignment, leaks, and ground movement. Prevent damage with proper grout timing steps.
TBM tunnel grout pressure spikes can lift the ground, risking damage to roads and buildings. Proper grout pressure control prevents ground uplift and project issues.